West University Place Texas Homepage
Search
News Flash Home
The original item was published from 4/3/2023 3:44:00 PM to 4/3/2023 5:45:26 PM.

News Flash

Community News

Posted on: April 3, 2023

[ARCHIVED] Edloe Street Pathway Improvements

Edloe Pathway News Flash

4/3/2023: On Monday, April 3, the City was made aware that the contractor working on the Edloe Street Pathway Project hit an AT&T fiber optic cable, which had not been marked.  AT&T was notified and is on site evaluating the area for repairs. Residents living in the 3700 Blocks of Georgetown St., and streets north to Bissonnet St. between Auden St. and Edloe St. may experience internet outages. At this time, there is no estimate from AT&T on service restoration. For updated outage information, please visit  AT&T Service Outage Information (att.com).  

We apologize for any inconvenience this may cause. A notification will be sent out once the repairs are complete.

Edloe Outage

____________________________________________________________________________________________________________________________________________________________

03/17/2023: Site preparation and grading began on March 13 and will continue when weather/ground conditions improve. The aluminum fencing installation along Poor Farm Ditch is now scheduled to begin the week of April 17. The installation should take approximately 2 weeks.   

For the latest project information, please visit www.westutx.gov/parkprojects  

For further questions or concerns, please contact Eduardo Barreto, Capital Projects Manager at (713) 662-5848 or via email at ebarreto@westutx.gov

____________________________________________________________________________________________________________________________________________________________

03/09/2023: Monday, March 13 the contractor, Project Management Group, LLC (PMG) will begin installing new fencing along Poor Farm Ditch. The installation should take approximately 2 weeks. Please expect flaggers to be onsite to assist with traffic flow around construction vehicles.

For the latest project information, please visit www.westutx.gov/parkprojects  

For further questions or concerns, please contact Eduardo Barreto, Capital Projects Manager at (713)662-5848 or via email at ebarreto@westutx.gov

____________________________________________________________________________________________________________________________________________________________

02/09/2023: On January 23, Council authorized staff to enter into a contract with PMG Project Management Group, LLC,  the low bidder, who also scored highest on the bid tabulation, to construct a pervious pathway along the east side of Edloe St. between Albans St. and Georgetown St. for construction of the Edloe Street Pathway with the following improvements:

  • A pervious pathway using recycled materials
  • 6-foot high aluminum fencing along west side of Poor Farm Ditch; including an update to the existing fencing located near the three pedestrian bridges to ensure a uniform look and feel.
  • Irrigation system
  • Benches
  • Drinking fountains
  • Landscaping

Procurement begins in mid-February with mobilization scheduled for early March. Final completion is scheduled in June, weather permitting. Other work not included in the bid is to relocate some of the CenterPoint Energy infrastructure and silt fencing installation, both of which are managed by the City. No parking signage has been installed on both sides of Edloe in the project area. In addition, Harris County Flood Control District is scheduled to begin removing the old chain link fence and the volunteer trees between the fence and the concrete channel on Tuesday, February 14, 2023.  

For the latest project information, please visit www.westutx.gov/parkprojects.     

For questions regarding this project, please contact Capital Project Manager Eduardo Barreto at 713-662-5848 or via email at ebarreto@westutx.gov

Facebook Twitter Email

Other News in Community News

New Black West U PD Patrol Cars with vibrant blue letters that read

Redesigned Patrol Fleet

Posted on: February 19, 2026
Milton Street Barrel

Milton Street Water Line Project

Posted on: February 5, 2026
METRO Sidewalk Panel Replacement

Sidewalk Replacement Project

Posted on: January 23, 2026
METRO Holcombe

METRO West Holcombe Project

Posted on: January 16, 2026
  1. West University Place Texas Homepage

Contact Us

  1. 3800 University Boulevard

  2. West University Place, TX 77005

  3. Phone: 713.668.4441

  4. Emergency: 911


  5. Hours of Operation:

  6. Monday-Friday

    7:30 a.m. - 5:30 p.m.

Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow